The published evidence supports only a preliminary split: TIG is the one process tied to a stated thin-gauge band of 0.5–4 mm (supplier-reported figure). And MIG is the one process with a stated output rate of 2–8 kg/h at large-scale production.

Flux-cored arc welding is described only as a structural process, with no rate, thickness or cost figures, so it cannot be shortlisted or excluded on these sources. Cost per metre, spatter, appearance, equipment price and qualification remain unsettled and must be verified with suppliers and in your own trials.

What this comparison can and cannot settle

Before you build a standardisation case, know which axes the published evidence actually covers. The sources give a deposition rate for MIG and a thickness band for TIG, and nothing comparable for flux-cored15.

They do not price a metre of weld in any process, and they carry no bead-profile, spatter or cleanup data. Cost is the clearest gap.

Welding is a manual operation that adds labour cost in low-volume sheet-metal work, alongside hardware insertion and surface finishing19. That tells you labour belongs in your cost model, but not what a metre costs.

A separate source prices wire feedstock at roughly one-fifth to one-tenth of powder feedstock per kilogram, but that compares additive-manufacturing feedstocks, not welding consumables14. So plan for two tracks: use the thickness and throughput statements to build a shortlist, and use supplier quotes plus in-house trials to settle cost, appearance and spatter.

Treat any figure you cannot trace to a stated thickness, joint and duty cycle as unverified.

TIG: the thin-gauge option, not the throughput option

TIG is the only process in this evidence set with a stated thickness band. It uses a non-consumable tungsten electrode and is positioned for precision bevel-type welds on very thin metal, 0.5–4 mm, mainly for aerospace components15.

That band sits inside the general sheet-fabrication envelope of about 0.2 mm up to 6 mm or more, which varies with process3. For automotive body panels at the thin end of that envelope, TIG is therefore a credible candidate on thickness grounds alone.

What the sources do not give is a minimum thickness before burn-through for any process, so the lower edge of the band is a trial question, not a specification. Where TIG loses ground is output.

No source in this set states a TIG deposition rate in kg/h, and the process is described by its precision role rather than its production rate15. If your part mix is dominated by thin visible panels where bead control matters more than metres per hour, TIG belongs on the shortlist.

If it is dominated by volume, the evidence gives you no rate to defend that choice.

MIG: the throughput candidate, with a condition attached

MIG is the only one of the three processes with a stated deposition rate. It uses a continuous wire electrode with inert gas for carbon and stainless steel, and the source puts penetration/output at 2–8 kg/h in large-scale production15.

Read the condition, not just the number. That figure is given for large-scale production, not for job-shop or manual-position work15.

Before you write it into a standardisation case, ask what current, wire-feed speed and duty cycle your own cells would run, because the sources give none of these to normalise the figure against.

A second source supports the general direction without adding a welding number: wire-based deposition reaches 1–3 kg/h against 0.03–0.1 kg/h for powder-bed additive processes, placing wire-fed processes at the high-output end14. That is an additive-manufacturing comparison, so use it as context for why wire processes are associated with output, not as a MIG rate.

For a shop whose bottleneck is metres of weld per shift, MIG is the reasonable first candidate on this evidence. The 2–8 kg/h range is a single-source reported value, so verify it on your own joint and thickness before it becomes a planning number15 (supplier-reported figure).

Flux-cored: no basis to shortlist or exclude

Flux-cored arc welding appears in the evidence only as a process that, with shielded metal arc, suits structural applications15. There is no deposition rate, no thickness range, no cost and no appearance data attached to it.

That leaves you unable to place it against MIG or TIG on any of the axes you care about. It is not ruled out — structural work may well be where your thicker brackets and frames sit — but nothing in these sources lets you rank it.

If flux-cored is a serious contender for your thicker structural parts, collect the missing inputs yourself before the comparison meeting: a deposition rate at your current and wire-feed speed, a thickness range. And a quoted cost per metre on a representative joint.

Without those, any ranking you present is opinion.

Why the wire-versus-powder figures do not transfer

You will find striking numbers in the additive-manufacturing literature and it is tempting to borrow them. One source reports powder feedstock costing 5–10 times more per kilogram than welding wire, and wire-based deposition at 1–3 kg/h against 0.03–0.1 kg/h for laser powder-bed fusion14.

Those figures compare wire-fed additive processes with powder-bed additive processes. They say nothing about welding wire against shielding gas, flux-cored wire or the labour content of a manual weld pass.

Importing them into a MIG-versus-TIG cost argument would put a number in front of your management that no welding source supports. Use them only for what they are: evidence that wire feedstock is the cheaper and faster-depositing family in additive manufacturing14.

Your welding cost case has to be built from your own consumable invoices and time studies.

Pre-RFQ checks before you standardise

These checks convert the evidence gaps into questions you can put to suppliers and to your own weld cells. Each one covers something the sources do not settle, so a supplier answer or a trial result is the only way to close it.

  • ✓Ask each supplier for a cost per metre on a named joint, thickness and material, broken into wire, gas, labour and power.
  • ✓Request a deposition rate at your planned current, wire-feed speed and duty cycle, not a headline maximum.
  • ✓Ask for sample beads on your thinnest and thickest production gauges so you can judge spatter and cleanup time yourself.
  • ✓Get equipment pricing as a package: power source, feeder, torch, regulator and fume extraction.
  • ✓Ask what welder and procedure qualification the supplier holds, and whether it covers your automotive customer's approval route.
  • ✓Confirm consumable lead time and availability for the specific wire and gas mix you intend to standardise on.
  • ✓Run a timed trial on one representative part per process and record arc-on time, rework and grinding minutes.

Where the sources disagree or leave conditions unstated

The evidence set contains complementary positions rather than head-to-head measurements. The table keeps each side visible so you can see which number needs verifying and how.

Disputed item (with unit)One source reportsAnother reportsWhat the buyer should do
MIG deposition rate (kg/h)2–8 kg/h, stated for large-scale productionNo second welding source gives a MIG rateVerify on your joint at your current and duty cycle
TIG usable thickness (mm)0.5–4 mm for precision bevel weldsGeneral sheet fabrication spans 0.2 mm to 6 mm+Trial your thinnest gauge for burn-through before committing
Wire deposition rate (kg/h)1–3 kg/h for wire-based additive deposition0.03–0.1 kg/h for powder-bed additiveDo not use as a welding rate; it compares AM processes
Feedstock cost per kg (relative)Powder 5–10× welding wire per kgNo welding-consumable price in the sourcesBuild cost from your own wire and gas invoices
Cost per metre of weld ($/m)Welding adds manual labour costNo per-metre price for any processRequest quoted $/m per process on one named joint

Before you request a quote

  • Ask the supplier for model-specific evidence and record the condition that would change your buying decision.
  • Ask the supplier for model-specific evidence and record the condition that would change your buying decision.
  • Ask the supplier for model-specific evidence and record the condition that would change your buying decision.
  • Ask the supplier for model-specific evidence and record the condition that would change your buying decision.
  • Ask the supplier for model-specific evidence and record the condition that would change your buying decision.
  • Ask the supplier for model-specific evidence and record the condition that would change your buying decision.
  • Ask the supplier for model-specific evidence and record the condition that would change your buying decision.
  • Ask the supplier for model-specific evidence and record the condition that would change your buying decision.